THERMO - BIMETAL RESEARCH

DO | SU STUDIO ARCHITECTURE // LOS ANGELES, CA // dorissung@earthlink.net

Sunday, August 28, 2011

Fabrication begins

Fabrication of Sunny Side up will begin this week! 


Posted by DWood at 12:55 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: fab, MA

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

DOSU Studio Architecture
8 Buggy Whip Drive, Rolling Hills, CA 90274
310.722.4458 info@dosu-arch.com

Contents

BLOCK (2) CATIA (6) DIAGRAM (2) fab (10) FORM (16) grasshopper (4) Hypar (10) jig (1) MA (62) MODEL (4) N.O. (5) Panels (14) Parametrics (5) Querl (2) RENDERINGS (3) STRUCTURE (4) testing (3) tile (4) tiles (1) videos (1)

Blog Archive

  • ►  2012 (3)
    • ►  October (3)
  • ▼  2011 (76)
    • ►  October (3)
    • ►  September (7)
    • ▼  August (9)
      • 6 panel prototype, A,B,C 21, 22
      • Doris Sung featured in USC Trojan Family Mag. and ...
      • Fabrication begins
      • Full Scale Prototype Tiles and Frame
      • str panels
      • AIA Visit featured on website
      • surface modification and eco analysis correlations
      • Final engineering, fabrication test, and material ...
    • ►  July (9)
    • ►  June (11)
    • ►  May (12)
    • ►  April (14)
    • ►  March (1)
    • ►  February (3)
    • ►  January (7)
  • ►  2010 (31)
    • ►  December (4)
    • ►  November (8)
    • ►  October (1)
    • ►  September (3)
    • ►  August (15)

Contributors

  • DWood
  • Doris
  • Julia Michalski
  • Kristi
  • Renata Ganis
  • evan.shieh.07

LINKS

  • USCsoA
  • DOSU STUDIO ARCHITECTURE
  • DYLAN WOOD
  • DOSU BLOG
Simple theme. Powered by Blogger.

Search This Blog